WEBVTT 00:00:00.000 --> 00:00:08.000 music 00:00:08.000 --> 00:00:16.000 music 00:00:16.000 --> 00:00:24.000 music 00:00:24.000 --> 00:00:30.000 music 00:00:30.000 --> 00:00:36.000 I'm very excited about this new project here at Richard Woodcock Education Center. 00:00:36.000 --> 00:00:41.000 We're going to be installing 481 solar panels on the roof of this building, 00:00:41.000 --> 00:00:45.000 which will be one of the biggest solar panel projects in town. 00:00:45.000 --> 00:00:49.000 beeping 00:00:49.000 --> 00:00:53.000 We received all of the solar panels in one shipment. 00:00:53.000 --> 00:00:57.000 We had a semi truck deliver them to campus 00:00:57.000 --> 00:00:60.000 and they're being stored in a conics box, 00:01:00.000 --> 00:01:06.000 and it's keeping them safe while we are preparing to install them on the roof. 00:01:06.000 --> 00:01:11.000 Each solar panel is about three to six, three by six feet. 00:01:11.000 --> 00:01:17.000 Each panel supplies the building with 330 watts of power, 00:01:17.000 --> 00:01:21.000 and that equates to approximately 00:01:21.000 --> 00:01:26.000 twelve to thirteen thousand dollars in savings each year. 00:01:26.000 --> 00:01:31.000 So the first thing you're going to see is the racks go up, and the racks support all the solar panels. 00:01:31.000 --> 00:01:38.000 After the racks are installed, you're going to see solar panels go up 00:01:38.000 --> 00:01:41.000 all throughout the length of this side and the other side. 00:01:41.000 --> 00:01:45.000 So they're going to face south to get maximum exposure from the sun. 00:01:45.000 --> 00:01:49.000 music 00:01:49.000 --> 00:01:54.000 My role is to manage, you know, the project from beginning to end 00:01:54.000 --> 00:01:57.000 making sure all the contractors are scheduled, 00:01:57.000 --> 00:01:62.000 making sure it's going to be on time and on budget. 00:02:02.000 --> 00:02:09.000 There are a lot of challenges. We need to keep the safety of everybody in mind at all times. 00:02:09.000 --> 00:02:11.000 The safety of the students, staff 00:02:11.000 --> 00:02:16.000 and the contract workers that will be installing the solar panels. 00:02:16.000 --> 00:02:21.000 They need to be tied up. They need to be wearing protective equipment at all times. 00:02:21.000 --> 00:02:25.000 And communication with the building staff and faculty is very important. 00:02:25.000 --> 00:02:29.000 music 00:02:29.000 --> 00:02:34.000 I think what this means for the future of Western Oregon University 00:02:34.000 --> 00:02:40.000 is that it will open the doors to similar sustainable projects in the future. 00:02:40.000 --> 00:02:46.000 The projected completion date is December thirty first of this year. 00:02:46.000 --> 00:02:55.000 music