PO#: P0086863 Purchase Date: September 06, 2012
Vendor: Graybar Electric Co Inc Value: $3,230.12
Index: UCS907


Line # Description Item Type Unit Price Quantity Total Price Receive Date
1 Systimax Wall mount fiber enclosure #760 060 426 Other $108.80 2 $217.60 09-14-2012


Internal Notes WOU # Invoice # Billing Index Billed Amt JV #
1 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $108.80 UCS907-direct
2 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $108.80 UCS907-direct

2 Systimax single mode OSP fiber (100) #760 053 850 (received 2538) Other $40.96 25 $1,039.56 10-08-2012


Internal Notes WOU # Invoice # Billing Index Billed Amt JV #
1 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $41.58 UCS907-direct
2 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $41.58 UCS907-direct
3 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $41.58 UCS907-direct
4 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $41.58 UCS907-direct
5 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $41.58 UCS907-direct
6 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $41.58 UCS907-direct
7 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $41.58 UCS907-direct
8 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $41.58 UCS907-direct
9 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $41.58 UCS907-direct
10 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $41.58 UCS907-direct
11 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $41.58 UCS907-direct
12 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $41.58 UCS907-direct
13 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $41.58 UCS907-direct
14 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $41.58 UCS907-direct
15 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $41.58 UCS907-direct
16 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $41.58 UCS907-direct
17 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $41.58 UCS907-direct
18 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $41.58 UCS907-direct
19 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $41.58 UCS907-direct
20 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $41.58 UCS907-direct
21 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $41.58 UCS907-direct
22 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $41.58 UCS907-direct
23 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $41.58 UCS907-direct
24 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $41.58 UCS907-direct
25 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $41.58 UCS907-direct

3 Systimax 2RU sliding shelf for fiber modules-EPN Other $238.34 1 $238.34 09-12-2012


Internal Notes WOU # Invoice # Billing Index Billed Amt JV #
1 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $238.34 UCS907-direct

4 Systimax 24LC fiber pass thru IPCH ready Other $125.13 4 $500.52 09-12-2012


Internal Notes WOU # Invoice # Billing Index Billed Amt JV #
1 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $125.13 UCS907-direct
2 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $125.13 UCS907-direct
3 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $125.13 UCS907-direct
4 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $125.13 UCS907-direct

5 Systimax Bezel 12-LC-SM-BL #760 109 389 Other $50.05 2 $100.10 09-13-2012


Internal Notes WOU # Invoice # Billing Index Billed Amt JV #
1 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $50.05 UCS907-direct
2 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $50.05 UCS907-direct

6 Systimax SFC-LCF09-8X Qwik II conn Blue Other $16.20 70 $1,134.00 09-12-2012


Internal Notes WOU # Invoice # Billing Index Billed Amt JV #
1 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
2 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
3 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
4 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
5 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
6 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
7 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
8 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
9 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
10 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
11 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
12 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
13 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
14 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
15 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
16 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
17 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
18 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
19 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
20 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
21 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
22 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
23 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
24 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
25 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
26 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
27 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
28 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
29 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
30 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
31 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
32 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
33 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
34 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
35 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
36 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
37 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
38 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
39 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
40 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
41 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
42 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
43 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
44 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
45 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
46 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
47 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
48 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
49 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
50 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
51 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
52 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
53 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
54 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
55 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
56 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
57 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
58 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
59 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
60 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
61 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
62 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
63 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
64 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
65 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
66 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
67 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
68 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
69 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct
70 UCS907 direct - Intramural Field project (order # 6504) PPF701 charged $35,000 for their part, Telecom pays the rest (6504)
2012-0237 UCS907 - direct $16.20 UCS907-direct